Address
304 North Cardinal St.
Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM

Walking my dog past the US Calgary Consulate General one morning, I started asking questions the Canadian public should have been asking years ago. What I found — through open sources, primary documents, field observation, and eight independent community sources — is that Calgary is not just a city with an American intelligence presence. It is currently operating as a full-spectrum foreign interference battleground, and our government isn’t telling us. American intelligence operations in Calgary, and the rest of Alberta, are currently taking place in a fast-paced manner, and have been doing so since the beginning of the second Trump Administration. These are closely tied to the Maple MAGA movement, and the Alberta Separatist movement being fronted by Premiere Danielle Smith. American intelligence operations in Canada are occurring under our nose, without our consent, and represent the most significant foreign interference in Canada that has occurred in our lifetime.
PART ONE OF THE FULL SPECTRUM SERIES
My name is Kevin Duska. I am the President of Prime Rogue Inc, a career intelligence professional, and have doctoral training in International Relations from The Ohio State University. I a, as of recently, a member of the Canadian Association of Journalists, and I founded Prime Rogue Inc in November 2022. I am also a resident of Calgary’s Killarney neighbourhood, and I walk my dog Wilco, an 80-pound rescue with the energy of a small country, through the downtown core most days.

A few weeks ago, walking past the US Consulate General on Macleod Trail, directly across the street from Calgary City Hall, I started paying attention in a way I hadn’t before. Not because anything looked obviously wrong. Because I knew enough to know what to look for.
I am, by training and by practice, an analyst of state behaviour and institutional transparency. My forthcoming memoir, Echo State: The Logs Can’t Lie Yet, documents over 300 Access to Information requests filed against Canadian federal institutions — what I call transparency warfare. That methodology, built over years of fighting bureaucratic obstruction, taught me one thing above all others: the absence of information is itself information.
So I started asking questions in the most direct way available to a journalist in a democratic society: I talked to people. Neighbours. Dog park regulars. Restaurant workers. People who live and work within sight of that building every day. And over several weeks of accidental fieldwork, conducted entirely from public space, with Wilco as my entirely non-covert companion — I triangulated a picture that the Canadian public has a right to see.

Am I conducting freelance counterintelligence? My own government is already doing the official version and isn’t telling you about it. So yes. Wilco and I are accidentally operational. This is Part One of what might be a long series.
“Every structural condition that intelligence doctrine requires for active human collection is present in Calgary right now. One of those conditions is a documented US consulate whose full staff roster is not public.”
The US Consulate General in Calgary maintains a public-facing website that describes its sections and mandates. Most Calgarians have never read it. They should.
The Political and Economic Section’s mandate is described as follows: it “monitors political and economic developments in the district to ensure U.S. policymakers are fully informed about events and issues of importance in Western Canada.” Priority issues listed include US-Canada trade relations, energy security, supply chain security, and — notably — cross-border security.
That is a public admission of intelligence collection activity. Overt, open-source, diplomatic-cover collection — but collection. The function described is the monitoring of a foreign jurisdiction’s political environment for the benefit of US policymakers. This is not a criticism. It is what consulates do. It is, in fact, standard practice documented across a century of diplomatic history and openly discussed in intelligence studies literature.
But the line that matters most is not in the Political and Economic Section description. It is in the document’s header, which states that the consulate is home to offices from the Department of State “and other United States Government departments and agencies.”
Other departments and agencies. Unnamed. In a public document that names three specific sections, two of which have dedicated contact emails. The unnamed agencies are unnamed for a reason. You do not name CIA, DIA, or NSA liaison presence in a public consulate document. You say “other agencies” and let the reader draw their own conclusions.
This is not speculation. This is a reading of a primary source document published by the US government. The American intelligence community has maintained a permanent operational presence in Calgary through the consulate structure for as long as that consulate has existed. This is not a new development. It is the baseline.
What is new is the acute escalation of that baseline in response to the most significant political crisis Alberta has faced in a generation.

Over several weeks of regular presence in the immediate vicinity of the US Consulate General, in public parks, on public sidewalks, in nearby commercial areas, I conducted informal interviews with multiple residents and regular visitors to the area on background. I asked a direct question: have you noticed more Americans around, specifically personnel entering and exiting the consulate?
Eight independent sources, none of whom had coordinated with each other, reported the same observation: a marked and noticeable increase in credentialed American personnel entering and exiting the facility. Multiple sources specifically noted badge lanyards consistent with consulate identification. Several described the increase as significant relative to their prior years of observation of the same building.
These sources are on background. I am not naming them and I am not required to. What I can report is that their observations are independent, consistent, specific, and contemporaneous with the most acute period of foreign interference activity targeting Alberta in recorded history.
Independent corroboration across eight sources who did not coordinate their observations is, in HUMINT methodology, called triangulated source corroboration. It is meaningful. It does not prove the presence of specific intelligence officers conducting specific operations. What it documents is anomalous activity at a foreign government facility during a period when that facility’s own published mandate — monitoring Alberta’s political developments — has never been more operationally relevant.
“The consulate sits directly across from Calgary City Hall. That is not incidental. Line-of-sight to municipal government and proximity to the business and legal district where Alberta Prosperity Project-connected lawyers and lobbyists operate is collection positioning.”

“Full spectrum” is military and intelligence doctrine language. It means all domains simultaneously: human intelligence collection, signals intelligence, information operations, and counterintelligence. Calgary is not experiencing one of these. It is experiencing all four, from multiple state and non-state actors, simultaneously, right now.
Beyond the consulate baseline, the American intelligence community’s engagement with the Alberta file has been documented at classified levels. The Alberta Prosperity Project — the separatist organization driving the current referendum petition — held at least three meetings with US State Department officials in Washington. One of those meetings, according to reporting in The Walrus, took place in a Sensitive Compartmented Information Facility — a SCIF. A classified facility. State Department officials do not use SCIFs for routine civil society meetings. They use them when the content requires protection from foreign signals intelligence collection.
APP lawyer and spokesman Jeffrey Rath stated publicly that the individuals he was meeting operated in “direct reporting lines to the president” and that the substance of those meetings reached the Oval Office “in near real time.” APP co-founder Dennis Modry told NBC News that the meetings covered switching to the US dollar, border security, and — in a detail that has received insufficient attention — the development of an independent Alberta military, with specific discussion of whether the US would be willing to help Alberta build that military.
Wesley Wark — a senior fellow at the Centre for International Governance Innovation who served on national security advisory councils under Prime Ministers Paul Martin and Stephen Harper — filed an affidavit characterizing the APP’s Washington meetings as “an open door to US political influence and potential interference.”
Russia’s targeting of Alberta is not subtle and it is not new. The website albertaseparatist.com, which appeared weeks after the April 2025 federal election accompanied by TikTok and YouTube accounts, has been linked by researchers to Storm-1516 — a documented Russian covert influence network with a history of building fictional websites to target foreign political audiences.
Russia’s Pravda News Network — a large coordinated system of Kremlin-aligned platforms — published 67 articles focused specifically on Alberta, Albertans, or the “51st state” narrative between December 2025 and April 2026. In the same period, Ontario, Canada’s most populous province, received 14 mentions. That is a targeting ratio of nearly five to one. The content pattern is consistent and deliberate: Alberta separatism is portrayed as popular and growing, Alberta as economically exploited by Ottawa, and foreign recognition of an independent Alberta as plausible.
CSIS director Daniel Rogers confirmed publicly in May 2026 that the Alberta referendum is, in his words, “rife for amplification” and the kind of foreign interference Russia has conducted previously. He declined to discuss ongoing investigations.
Calgary’s intelligence history long predates the referendum crisis. The city has been a target of foreign economic espionage since at least the Cold War era, when Soviet intelligence prioritized understanding Western energy infrastructure, pricing strategy, and pipeline capacity. That baseline never went away.
In 2012, the proposed CNOOC takeover of Calgary-based Nexen Inc. — a $15.1 billion bid by China’s state-owned oil company — prompted CSIS to warn publicly that state-owned enterprises with ties to foreign intelligence agencies pursuing control over Canada’s strategic energy sector represented a direct security threat. CSIS produced an Alberta-specific intelligence advisory — the “Protect Your Research: Alberta” factsheet — noting the province’s approximately $334 billion GDP contribution and flagging energy sector espionage as a named priority threat.
The energy sector targeting has not diminished. It has been joined by the political crisis, creating a convergence of economic and political intelligence interest that makes Calgary’s current threat environment unlike any other Canadian city.
The fourth vector is your own government’s response — and its failure to communicate that response to the public it is supposed to protect.
Alberta Premier Danielle Smith has requested a federal security clearance to receive classified CSIS briefings specifically because her province has zero independent capacity to understand the foreign interference threat targeting it. Security expert Wesley Wark has characterized this as both naive and an admission — naive because foreign interference will occur regardless of whether Smith is briefed, and an admission because it confirms that the province hosting the most consequential political vote in its history has no intelligence infrastructure to protect that process.
The federal SITE Task Force — the Security and Intelligence Threats to Elections mechanism — exists precisely for moments like this. What it has told the Alberta government, and what the Alberta government has told Albertans, has been close to nothing. The RCMP told Premier Smith there is “no credible evidence” of state actor interference in Alberta’s politics. That assessment, made against the backdrop of documented Storm-1516 operations and SCIF-level meetings between US officials and separatist organizers, requires considerably more public scrutiny than it has received.

Journalism is not intelligence analysis and I will not pretend otherwise. But the analytical framework I bring to this work, built on a doctoral training in International Relations, training in intelligence methodology and years of institutional transparency research, allows for a structured probability assessment of the kind that intelligence professionals use when direct confirmation is unavailable.
The question is not whether foreign intelligence personnel are active in the Calgary theater. The structural evidence for that baseline is documentary and near-certain. The consulate exists. Its mandate includes political monitoring. Its unnamed “other agencies” are not named for documented reasons. That is not a probability estimate. That is a structural fact.
The more specific question — whether intelligence officers are conducting active operational tasking specifically related to the referendum, the APP, and the Canada-US sovereignty crisis right now — carries a probability I assess at 85 to 90 percent for US operations and comparably high for Russian information operations infrastructure, based on:
I am not asserting that specific named individuals are conducting specific operations in Calgary. I am asserting that every structural and evidentiary indicator available through open sources points in one direction, and that the Canadian public has not been given the information it needs to evaluate that direction for itself.
The public record on Calgary’s intelligence environment is substantial but partial. What remains dark — what has not been disclosed to Canadians despite their legal right to know — includes the following:
Prime Rogue Inc, the Signal Cage and Right to Know Canada are filing the following Access to Information and Privacy Act requests:
We will publish every response, every refusal, and every Glomar. The absence of information is itself information. We have learned that much. We do not expect to receive much.

Finland calls it resilience. Estonia calls it societal defence. Sweden has built civil preparedness infrastructure around it for decades. The concept is called whole-of-society counter-foreign-interference — the principle that democratic resilience against hostile state action requires not just government intelligence services but an informed, active, observant citizenry.
Canada’s government has endorsed this framework in language while refusing to implement it in practice. The practice would require telling Canadians what is actually happening in their cities. That is apparently too much to ask.
So we are doing it ourselves. The Full Spectrum series — published across Prime Rogue, Signal Cage, FAFO Labs, Right to Know Canada, Civil Defense Canada, and Maple Leaks — is an attempt to build the citizen counterintelligence infrastructure that our government will not build for us. Walking your dog past the consulate and paying attention. Talking to your neighbours. Filing access to information requests. Learning to read the radio frequency environment of your own city. None of this is illegal. All of it is journalism. All of it is citizenship.
Calgary is the most contested city in Canada right now. You live here. You have a right to know what is happening in your streets.
About the Author
Kevin J.S. Duska Jr. is the founder and President of Prime Rogue Inc., a Calgary-based private intelligence and strategic transparency firm. He undertook doctoral studies (ABD) in International Relations at Ohio State University under Alexander Wendt, Randy Schweller, and Ted Hopf, and is a member of the Canadian Association of Journalists. His CADA-funded memoir, Echo State: The Logs Can’t Lie Yet, is scheduled for publication on September 28, 2026 — Right to Know Day.
[…] announced it wasn’t joining the coalition. We did it with the drone war. We do it with intelligence sharing so thorough that the line between sharing and participating requires a very expensive lawyer to locate. What we […]
[…] Rogue Inc. is a Calgary-based private intelligence and strategic transparency firm. This investigation is part of our ongoing OSINT work on […]
[…] locked in after the December 2025 draw, the runner-up of Group A plays the runner-up of Group B — full stop, no third-place-team variability, no goal-difference jockeying across groups. That match is […]
[…] intimidation. Devices compromised. Relatives back home harassed. Travel warnings issued. In 2024, a prominent Baloch-Canadian student activist in Calgary fled public life after a campaign of digital harassment traced back to accounts linked to Pakistani […]
[…] in the Round of 32, in Dallas, on July 3. Group G is Belgium, Egypt, Iran, and New Zealand — currently shaping up as a contest between Belgium and a fast-improving Egypt for top spot, with Belgium presently the […]
[…] 2023, the organization has explicitly framed its mission as Jewish political mobilization in Canada — turning out votes, volunteers, and advocacy specifically tied to Israel’s security […]
[…] privacy-first implication: every piece of exposed personal data is targeting data for this kind of operation. Privacy is a security control, not a […]
[…] as the former chair of the Michigan Republican Party. As ambassador, he has repeatedly treated Canadian domestic politics as his […]